            四級沖刺練習閱讀(75)

              In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

              There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

              After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

              After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

              In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

              1. The main difference between panel method and the method discussed in the last paragraph is_______.

              A. the latter uses ready-made internal features

              B. panels are cast in a level position

              C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

              D. the former is more expensive than the latter

              22. Which of these statements is TRUE of system building?

              A. It employs more men. B. It is difficult and dangerous.

              C. It can save both time and money. D. It means less mechanization.

              23. According to the passage, the principle of system building is that_______.

              A. construction methods are safer

              B. buildings are made from a set of standardized units

              C. similar buildings can be produced

              D. all units are produced on the site

              24. The usual fixed length in the modular system is_______.

              A. twenty centimeters B. ten millimeters

              C. fifty centimeters D. ten centimeters

              25. What lifts the concrete panels onto the building?

              A. Cranes. B. Man-power.

              C. Pulleys. D. Hydraulic jacks.

              21. A 22. C 23. B 24. D 25. A

              

              In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

              There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

              After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

              After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

              In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

              1. The main difference between panel method and the method discussed in the last paragraph is_______.

              A. the latter uses ready-made internal features

              B. panels are cast in a level position

              C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

              D. the former is more expensive than the latter

              22. Which of these statements is TRUE of system building?

              A. It employs more men. B. It is difficult and dangerous.

              C. It can save both time and money. D. It means less mechanization.

              23. According to the passage, the principle of system building is that_______.

              A. construction methods are safer

              B. buildings are made from a set of standardized units

              C. similar buildings can be produced

              D. all units are produced on the site

              24. The usual fixed length in the modular system is_______.

              A. twenty centimeters B. ten millimeters

              C. fifty centimeters D. ten centimeters

              25. What lifts the concrete panels onto the building?

              A. Cranes. B. Man-power.

              C. Pulleys. D. Hydraulic jacks.

              21. A 22. C 23. B 24. D 25. A

              

            主站蜘蛛池模板: 又硬又粗又大一区二区三区视频| 麻豆一区二区在我观看| 亚洲综合av永久无码精品一区二区| 人妻无码一区二区三区AV| 视频在线观看一区二区三区| 亚洲av无码不卡一区二区三区| 四虎成人精品一区二区免费网站| ...91久久精品一区二区三区 | 国产在线观看精品一区二区三区91| 国产av成人一区二区三区| 香蕉视频一区二区三区| 国产一区二区精品久久岳√| 午夜视频在线观看一区| 国产精品久久久久久一区二区三区| 久久无码人妻一区二区三区午夜| 亚洲AV无码一区二区三区系列| 国产午夜三级一区二区三| 国产精品乱码一区二区三区| 一区 二区 三区 中文字幕| 国产一区二区三区在线免费| 在线一区二区三区| 国产一区二区三区手机在线观看| 国产一区二区草草影院| 无码少妇丰满熟妇一区二区| 国产成人无码AV一区二区在线观看 | 国产精品一区在线观看你懂的| 日韩AV片无码一区二区不卡| V一区无码内射国产| 久久精品亚洲一区二区| 天堂一区二区三区精品| 怡红院一区二区三区| 国产主播一区二区三区在线观看| 福利电影一区二区| 大伊香蕉精品一区视频在线 | 国产自产在线视频一区| 久久4k岛国高清一区二区| 红杏亚洲影院一区二区三区| 亚洲精品日韩一区二区小说| 国产主播一区二区三区| 精品乱码一区二区三区四区| 久久国产高清一区二区三区|